Weak Teeth in Xray OPG

Upper & Lower Full Mouth Implants in OPG

Weak Teeth

What We Did:

  • Chief Complain of Mobility in the teeth.
  • Missing Teeth
  • Root recession

Surgical Phase

  • All the teeth extracted under local anesthesia without pain
  • Implant placed with good primary stability
  • Sutures taken
  • Temporary prosthesis given.
  • Total Time Duration of One Week Required.

Prosthesic Phase

  • After Healing of 4 Months
  • Indirect impression taken
  • Jig Trial taken
  • CAD CAM Milled Titanium Framework Checked.
  • Cad Cam Ceramic Teeth Prepared

Prosthesis Delivery and Checkup

  • All the Implant Tightened at 30NCM torque.
  • Prosthesis Occlusion checked.
  • Ceramic Bridge Luting done with Cement.
  • Happy Smiling Patient
Leave a reply