What We Did:
- Chief Complain of Mobility in the teeth.
- Missing Teeth
- Root recession
Surgical Phase
- All the teeth extracted under local anesthesia without pain
- Implant placed with good primary stability
- Sutures taken
- Temporary prosthesis given.
- Total Time Duration of One Week Required.
Prosthesic Phase
- After Healing of 4 Months
- Indirect impression taken
- Jig Trial taken
- CAD CAM Milled Titanium Framework Checked.
- Cad Cam Ceramic Teeth Prepared
Prosthesis Delivery and Checkup
- All the Implant Tightened at 30NCM torque.
- Prosthesis Occlusion checked.
- Ceramic Bridge Luting done with Cement.
- Happy Smiling Patient